Print
Location: USA-Central-1 (Dallas, TX) - Infrastructure Maintenance
Date & Time: August 29, 2019 @ 07:00 AM EDT - 08:00 AM EDT
The USA-Central-1 (Dallas, TX) facility will be performing generation plant load transfer testing. During the test, the power load will be transferred from utility to generation plant and then back to utility. This type of maintenance is potentially service affecting, but no impact is expected to services.
This notice is for advisory purposes only.
Related Articles
Comments